Norconsult was the main advisor on the power transmission line between Insukamini Substation in Bulawayo, Zimbabwe, and Matimba Thermal Power Station in South Africa (routed through Botswana).
Norconsult has assisted the Government of the Republic of Botswana with plans for projecting an underground storage facility for fuel.
Recent developments include the selection of Norconsult to undertake Review, Verification and Update of the Detailed Design for Yatta Dam, Canal and Water Supply & Sanitation Project as well as Construction Supervision of the Works. The duration of the assignment is 42 months to include all phases of the Project.